I-490 Perinton Update: Full Reopening Between Exits 26 and 27 (2026)

Breaking News: I-490's Full Reopening - A Temporary Victory for Commuters!

Imagine the relief of drivers in Perinton, NY, as the State Department of Transportation (DOT) announces a full reopening of I-490 between exits 26 and 27!

This stretch of highway, which had been reduced to a single lane in both directions for an extensive bridge replacement project, is now fully accessible. The DOT's announcement on Thursday brings a temporary respite to commuters who have endured months of delays and detours.

But here's where it gets controversial: while the reopening is a welcome relief, it's only a temporary fix. The DOT has confirmed that construction will continue during the 2026 construction season, meaning this victory is short-lived.

The $60 million bridge replacement project has been a significant undertaking, with exit 27 remaining closed for months. However, on December 11, the DOT announced its reopening, providing some much-needed relief to the community.

And this is the part most people miss: the reopening is a strategic move to ease traffic flow during the holiday season. The DOT aims to minimize disruptions during peak travel times, but the construction isn't over yet.

So, while we celebrate this temporary victory, we must also prepare for the ongoing construction and potential disruptions in the new year. It's a delicate balance between progress and convenience.

What are your thoughts on this temporary reopening? Do you think it's a smart move by the DOT, or is it just a temporary fix that will cause more headaches down the line? Share your opinions and let's discuss the future of I-490's construction!

I-490 Perinton Update: Full Reopening Between Exits 26 and 27 (2026)
Top Articles
Latest Posts
Recommended Articles
Article information

Author: Nicola Considine CPA

Last Updated:

Views: 6568

Rating: 4.9 / 5 (69 voted)

Reviews: 84% of readers found this page helpful

Author information

Name: Nicola Considine CPA

Birthday: 1993-02-26

Address: 3809 Clinton Inlet, East Aleisha, UT 46318-2392

Phone: +2681424145499

Job: Government Technician

Hobby: Calligraphy, Lego building, Worldbuilding, Shooting, Bird watching, Shopping, Cooking

Introduction: My name is Nicola Considine CPA, I am a determined, witty, powerful, brainy, open, smiling, proud person who loves writing and wants to share my knowledge and understanding with you.